Impact
Established a reference for the connected tower and low-rise building during renovation, including how the two portions responded together.
Challenge
Renovation work required assessment of the connected Book Tower and Book Building as a coupled property.
STRAAM approach
STRAAM measured both portions on January 29–30, 2020, using ten triaxial accelerometers and two SKG systems, including localized façade measurements.
Result
The work documented the relationship between the tower and its connected low-rise section, giving the project team information for renovation planning.


