
Shirley, NY, United States
Concrete Road Bridge | 2013Smith Point Bridge
STRAAM assessed 16 concrete spans of Smith Point Bridge for Hardesty & Hanover using dynamic measurements, impact testing and loaded-truck testing. The final Phase II report supplied baseline dynamic signatures to support the engineer’s finite-element model calibration and superseded the Phase I interpretation. Impact testing was inconclusive for damage identification because of coupled modes; the findings are a historical assessment, not a present-day safety certification.

