Suspension Rail and Car Bridge

This bridge is 2090 metres long suspension bridge. The bridge is 105 years old and consists of 7 vehicular lanes and 4 subway tracks. STRAAM was contracted to perform a dynamic analysis of each suspension cable. Using our instrumentation STRAAM was able to identify each cables fundamental frequency within a matter of minutes. This was then used to calculate the amount of tension in each cable.