The company had been running the port facility for more than 30 years and was interested in knowing if there were any problems with the aging facility. The facility includes equipment for transporting and loading minerals onto very large barges. The loading mechanism is protected from ship impact by a series of dolphins. STRAAM not only investigated all of the land based equipment, but also investigated the stability of the dolphins. One of the dolphins was found to have a partial foundation failure.

Download Project Sheet

Download PDF

Client

  • Companhia Vale do Rio Doce

Services Provided

STRAAM Group personnel were operating with the help of a Brasilian Geotechnical company. The servo-accelerometers (later used as the basic work-horse for STRAAM) were housed in a dedicated box and measurements of the response to a ship impact were obtained.

Value Added

The client was reassured about the integrity of the large part of the structure. Additionally, with the foundation failure identified, resources could be dedicated to dealing with this small-scale problem. The rest of the equipment was scheduled for another inspection after 5 years of operation.


<< All Project Sheets

© 2024 Straam Group Inc. All Rights Reserved. Website Designed and Developed by MoreSALES.ca.